University High School

show all projects
Rendering of modern building exterior along the incline of California Street
Rendering of building exterior from angled view across California Street with sidewalk, street trees, and vehicles
Rendering of interior double-height atrium with large glass windows, exterior balcony walkway, open gathering spaces
Section perspective rendering looking west of interior showing multiple stories with offices, classrooms, and gymnasium
Rendering of gymnasium interior showing basketball players
Rendering of view from entry arcade showing student walking on ramp entry
Birds eye view rendering of building looking south

Project Information

Location

3150 California Street, San Francisco, CA

Project

49,000 SF
Educational and Athletic Facilities

Completion

2025

Architect

Leddy Maytum Stacy Architects

Financing

Bank Loan

Capital Campaign

Project Description

University High School undertook a Master Planning process in 2018 to evaluate how to best serve their students, faculty and staff within their existing facilities, and to enhance their campus experience through the development of a property that they own at 3150 California Street.


ECB was hired to manage the development of the California Street property, to meet both the academic and athletic needs of the school and create classrooms and gathering spaces that respond to the needs of 21st Century teaching and learning best practices.

The new California Street building will serve as a visible and welcoming second “front door” to UHS along the transit-rich California Street corridor.

This new building, of approximately 49,000 square feet, is expected to go through a full review and entitlement process with the City of San Francisco Planning Department, which may take 1-2 years.

When complete, the project will include 6 new science labs, 4-6 new classrooms, U-Lab and faculty and administration offices, 3,000 SF of indoor commons with flexibility for programming, a 6,000 SF terrace, and basketball courts (both a competition size court that meets NCAA standard dimensions, as well as cross courts).

ECB is acting as the project manager for the entire development process, including entitlements, design, permitting, bidding and contracting and construction.

Fact Sheet
310 KB